Asbestos in vermiculite insulation
IRIS laboratory team · NVLAP accredited · 7:30
Why vermiculite needs its own approach, how much to collect from an attic, and what a negative PLM result does and does not tell you.
Sign in to save your place and download the material.
Vermiculite insulation needs a larger sample than other building materials. The lab needs that volume for a reliable analysis.
Before you start
If the material is friable or heavily contaminated, have a licensed professional collect it. If you collect it yourself:
- shut down any heating or cooling system so released fibres do not spread
- wet the material lightly
- wear nitrile gloves and an N100 or P100 respirator
- never dry-disturb it
Collect and pack
- Take each of the three samples from a different area.
- Seal each sample in its own zip-seal bag, then seal that inside a second bag. Wipe the outside of both bags with a damp cloth.
- Label each bag with the sample ID and location, matching the COC exactly.
- On the COC, list each sample ID, the material (vermiculite), the location and the analysis you need, then sign and date it.
Send it
Drop off at 2333 US-22 West, Union, NJ 07083, Monday to Friday before 4 PM ET, or ship overnight with the COC inside the package. Bulk samples travel at ambient temperature, with no refrigeration.
Start the asbestos bulk COC, or download the bulk COC (PDF). If you are unsure which analysis to ask for, contact the lab or email support@irislaboratories.com.
Asbestos bulk
Building materials by PLM, point count and TEM for non-friables.
Start this COCDownloads
Downloads are behind sign-in.
Sign in to download